Prices in our guide are gross prices, VAT-free rates are marked with ****.
Water and wastewater service charges (water fee, wastewater service fee, water load fee, base fee) in case of residential customers from 1 July 2013, in case of business customer prices have not changed since 1 January 2012 or since the date of the take-over of the service area.
EUR = 329.99 HUF; 1 USD = 294.56 HUF
(Daily exchange rates of the Central Bank of Hungary on 2 January 2020)
Water service in Budapest |
|||
Residential customers |
|||
Water tariff |
218.95 HUF/m3 |
||
Base fee in case of consumption over 0 m3/month* |
179.95 HUF/month |
||
Non residential customers |
|||
Water tariff |
252.60 HUF/m3 |
||
Base fee** | |||
In case of daily average consumption between 0 m3 and 7,5 m3 per year |
18,897.60 HUF/year |
||
In case of daily average consumption between 7,5 m3 and 15 m3 per year |
69,037.20 HUF/year |
||
In case of daily average consumption over 15 m3 per year |
112,623.60 HUF/year |
* Basic fee is invoiced per connection in case the current consumption is over 0 m3.
** Invoicing is based on the daily average consumption on the business organization’s contracted connections.
Water and wastewater service in Biatorbágy* |
|||
Residential customers |
|||
Water tariff |
423.40 HUF/m3 |
||
Wastewater tariff |
526.40 HUF/m3 |
||
Water load fee |
4.30 HUF/m3 | ||
Non-utility collected wastewater removal fee** | |||
Sort pipe (under 40 m) |
12,937.50 HUF/turn |
||
Long pipe (over 40 m) |
15,524.50 HUF/ turn |
||
Non-residential customers |
|||
Water tariff |
502.90 HUF/m3 |
||
Wastewater tariff |
624.10 HUF/m3 |
||
Water load fee |
5.10 HUF/m3 | ||
Non-utility collected wastewater removal fee** | |||
Short pipe (under 40 m) |
14,376.40 HUF/turn |
||
Long pipe (over 40 m) |
17,251.70 HUF/turn |
* Budapest Waterworks carries out water and wastewater services in Biatorbágy since 1 September 2014.
** Budapest Waterworks carries out non-utility collected wastewater removal since 28 May 2015.
Water and wastewater service in Budakeszi* |
|||
Residential customers |
|||
Water tariff |
218.90 HUF/m3 |
||
Wastewater tariff |
302.50 HUF/m3 |
||
Water load fee |
8.00 HUF/m3 |
||
Base fee in case of consumption over 0 m3 per month** |
179.95 HUF/month |
||
Non-utility collected wastewater removal fee | |||
Non-channelled customer, short pipe (under 30 m) |
9,681.00 HUF/turn |
||
Non-channelled customer, long pipe (over 30 m) |
11,617.00 HUF/turn |
||
Channelled customer, short pipe (under 30 m) |
13,275.00 HUF/turn |
||
Channelled customer, long pipe (over 30 m) |
15 930 HUF/turn |
||
Non residential customers |
|||
Water tariff |
252,6 HUF/m3 |
||
Wastewater tariff |
571,8 HUF/m3 |
||
Water load fee |
8,9 HUF/m3 |
||
Base fee*** | |||
In case of daily average consumption between 0 m3 and 7,5 m3 per year |
18,897.60 HUF/year |
||
In case of daily average consumption between 7,5 m3 and 15 m3 per year |
69,037.20 HUF/year |
||
In case of daily average consumption over 15 m3 per year |
112,623.60 HUF/year |
||
Non-utility collected wastewater removal fee | |||
Channelled customer, short pipe (under 30 m) |
14,751.00 HUF/turn |
||
Channelled customer, long pipe (over 30 m) |
17,701.00 HUF/turn |
||
Non-channelled customer, short pipe (under 30 m) |
10,757.00 HUF/turn |
||
Non-channelled customer, long pipe (over 30 m) |
12,908.00 HUF/turn |
* Budapest Waterworks carries out wastewater services in Budakeszi since 1 November 2013.
** Basic fee is invoiced per connection in case the current consumption is over 0 m3.
*** Invoicing is based on the daily average consumption on the business organization’s contracted connections.
Water service in Budaörs |
|||
Residential customers |
|||
Water tariff |
215.40 HUF/m3 |
||
Non residential customers |
|||
Water tariff |
303.00 HUF/m3 |
||
Base fee* | |||
In case of daily average consumption between 0 m3 and 7,5 m3 per year |
18,897.60 HUF/year |
||
In case of daily average consumption between 7,5 m3 and 15 m3 per year |
69,037.20 HUF/year |
||
In case of daily average consumption over 15 m3 per year |
112,623.60 HUF/year |
* Invoicing is based on the daily average consumption on the business organization’s contracted connections.
Water service in Csömör* |
|||
Residential customers |
|||
Water tariff |
218.95 HUF/m3 |
||
Base fee in case of consumption over 0 m3/month** |
179.95 HUF/month |
||
Non residential customers |
|||
Water tariff |
252.60 HUF/m3 |
||
Base fee*** | |||
In case of daily average consumption between 0 m3 and 7,5 m3 per year |
18,897.60 HUF/year |
||
In case of daily average consumption between 7,5 m3 and 15 m3 per year |
69,037.20 HUF/year |
||
In case of daily average consumption over 15 m3 per year |
112,623.60 HUF/year |
* Budapest Waterworks does not provide potable water services in the community of Csömör, it provides water services
only to certain customers in some of its areas adjacent to Budapest (Majorszegi dűlő).
** Basic fee is invoiced per connection in case the current consumption is over 0 m3.
*** Invoicing is based on the daily average consumption on the business organization’s contracted connections.
Water and wastewater service in Dunabogdány* |
|||
Residential customers |
|||
Water tariff |
357.80 HUF/m3 |
||
Wastewater tariff |
331.50 HUF/m3 |
||
Water load fee |
10.30 HUF/m3 |
||
Water base fee |
285.80 HUF/month |
||
Wastewater base fee |
377.20 HUF/month |
||
Non residential customers |
|||
Water tariff |
492.80 HUF/m3 |
||
Wastewater tariff |
541.00 HUF/m3 |
||
Water load fee |
11.40 HUF/m3 |
* In Dunabogdány, water and wastewater services are carried out by Budapest Waterworks since 1 January 2017.
Water and wastewater service in Halásztelek* |
|||
Residential customers |
|||
Water tariff |
218.9 HUF/m3 |
||
Wastewater tariff |
291.10 HUF/m3 |
||
Water load fee |
17.90 HUF/m3 |
||
Base fee in case of consumption over 0 m3/month per month** |
179.95 HUF/month |
||
Non residential customers |
|||
Water tariff |
252.60 HUF/m3 |
||
Wastewater tariff |
526.90 HUF/m3 |
||
Water load fee |
19.90 HUF/m3 |
||
Base fee*** | |||
In case of daily average consumption between 0 m3 and 7,5 m3 per year |
18,897.60 HUF/year |
||
In case of daily average consumption between 7,5 m3 and 15 m3 per year |
69,037.20 HUF/year |
||
In case of daily average consumption over 15 m3 per year |
112,623.60 HUF/year |
* In Halásztelek, wastewater services are carried out by Budapest Waterworks since 6 December 2013.
** Basic fee is invoiced per connection in case the current consumption is over 0 m3.
*** Invoicing is based on the daily average consumption on the business organization’s contracted connections.
Water and wastewater service in Kisoroszi* |
|||
Residential customers |
|||
Water tariff |
218.90 HUF/m3 |
||
Wastewater tariff |
331.30 HUF/m3 |
||
Water load fee |
10.30 HUF/m3 |
||
Water base fee in case of consumption over 0 m3/month per month** |
179.95 HUF/month |
||
Wastewater base fee |
296.90 HUF/month |
||
Non residential customers |
|||
Water tariff |
253.00 HUF/m3 |
||
Wastewater tariff |
852.20 HUF/m3 |
||
Water load fee |
11.40 HUF/m3 |
||
Base fee*** | |||
In case of daily average consumption between 0 m3 and 7,5 m3 per year |
18,897.60 HUF/year |
||
In case of daily average consumption between 7,5 m3 and 15 m3 per year |
69,037.20 HUF/year |
||
In case of daily average consumption over 15 m3 per year |
112,623.60 HUF/year |
* In Kisoroszi, wastewater services are carried out by Budapest Waterworks since 1 January 2014.
** Basic fee is invoiced per connection in case the current consumption is over 0 m3.
*** Invoicing is based on the daily average consumption on the business organization’s contracted connections.
Water and wastewater service in Pócsmegyer* |
|||
Residential customers |
|||
Water tariff |
218.90 HUF/m3 |
||
Wastewater tariff |
331.30 HUF/m3 |
||
Water load fee |
10.30 HUF/m3 |
||
Water base fee in case of consumption over 0 m3/month per month** |
179.95 HUF/month |
||
Wastewater base fee |
296.90 HUF/month |
||
Non-utility collected wastewater removal fee | |||
Short pipe (under 20 m) |
12,937.50 HUF/turn |
||
Long pipe (over 20 m) |
15,524.50 HUF/turn |
||
Non residential customers |
|||
Water tariff |
252.60 HUF/m3 |
||
Wastewater tariff |
655.30 HUF/m3 |
||
Water load fee |
11.40 HUF/m3 |
||
Base fee*** | |||
In case of daily average consumption between 0 m3 and 7,5 m3 per year |
18,897.60 HUF/year |
||
In case of daily average consumption between 7,5 m3 and 15 m3 per year |
69,037.20 HUF/year |
||
In case of daily average consumption over 15 m3 per year |
112,623.60 HUF/year |
||
Non-utility collected wastewater removal fee | |||
Short pipe (under 20 m) |
14,376.40 HUF/turn | ||
Long pipe (over 20 m) |
17,251.70 HUF/turn |
* In Pócsmegyer, wastewater services are carried out by Budapest Waterworks since 1 January 2014.
** Basic fee is invoiced per connection in case the current consumption is over 0 m3.
*** Invoicing is based on the daily average consumption on the business organization’s contracted connections.
Water and wastewater service in Százhalombatta* |
|||
Residential customers |
|||
Water tariff |
271.00 HUF/m3 |
||
Wastewater tariff |
253.20 HUF/m3 |
||
Water load fee |
0.00 HUF/m3 |
||
Non residential customers |
|||
Water tariff |
406.40 HUF/m3 |
||
Wastewater tariff |
490.20 HUF/m3 |
||
Water load fee |
0.00 HUF/m3 |
* In Százhalombatta, water and wastewater services are carried out by Budapest Waterworks since 1 April 2016.
Water and wastewater service in Szigetmonostor* |
|||
Residential customers |
|||
Water tariff |
218.90 HUF/m3 |
||
Wastewater tariff |
331.30 HUF/m3 |
||
Water load fee |
10.30 HUF/m3 |
||
Water base fee in case of consumption over 0 m3/month per month** |
179.95 HUF/month |
||
Wastewater base fee |
296.90 HUF/month |
||
Non-utility collected wastewater removal fee | |||
Short pipe (under 20 m) |
12,937.50 HUF/turn |
||
Long pipe (over 20 m) |
15,524.50 HUF/turn |
||
Non residential customers |
|||
Water tariff |
253.40 HUF/m3 |
||
Wastewater tariff |
655.30 HUF/m3 |
||
Water load fee |
11.40 HUF/m3 |
||
Base fee*** | |||
In case of daily average consumption between 0 m3 and 7,5 m3 per year |
18,897.60 HUF/year |
||
In case of daily average consumption between 7,5 m3 and 15 m3 per year |
69,037.20 HUF/year |
||
In case of daily average consumption over 15 m3 per year |
112,623.60 HUF/year |
||
Non-utility collected wastewater removal fee | |||
Short pipe (under 20 m) |
14,376.40 HUF/turn |
||
Long pipe (over 20 m) |
17,251.70 HUF/turn |
* In Szigetmonostor, wastewater services are carried out by Budapest Waterworks since 1 January 2014.
** Basic fee is invoiced per connection in case the current consumption is over 0 m3.
*** Invoicing is based on the daily average consumption on the business organization’s contracted connections.
Water and wastewater service in Szigetszentmiklós* |
|||
Residential customers |
|||
Water tariff |
356.10 HUF/m3 |
||
Wastewater tariff |
315.20 HUF/m3 |
||
Water load fee |
48.00 HUF/m3 |
||
Non residential customers |
|||
Water tariff |
554.20 HUF/m3 |
||
Wastewater tariff |
636.50 HUF/m3 |
||
Water load fee |
53.30 HUF/m3 |
* In Szigetszentmiklós, water and wastewater services are carried out by Budapest Waterworks since 17
December 2013. In the local administrative area of Szigetszentmiklós – Lakihegy, potable water service related fees
are different.
Water and wastewater service in Szigetszentmiklós – Lakihegy* |
|||
Residential customers |
|||
Water tariff |
218.90 HUF/m3 |
||
Wastewater tariff |
315.20 HUF/m3 |
||
Water load fee |
48.00 HUF/m3 |
||
Base fee in case of consumption over 0 m3/month per month** |
179.95 HUF/month |
||
Non residential customers |
|||
Water tariff |
252.90 HUF/m3 |
||
Wastewater tariff |
636.50 HUF/m3 |
||
Water load fee |
53.30 HUF/m3 |
||
Base fee*** | |||
In case of daily average consumption between 0 m3 and 7,5 m3 per year |
18,897.60 HUF/year |
||
In case of daily average consumption between 7,5 m3 and 15 m3 per year |
69,037.20 HUF/year |
||
In case of daily average consumption over 15 m3 per year |
112,623.60 HUF/year |
* In Szigetszentmiklós – Lakihegy, the wastewater service is carried out by Budapest Waterworks since
17 December 2013.
** Basic fee is invoiced per connection in case the current consumption is over 0 m3.
*** Invoicing is based on the daily average consumption on the business organization’s contracted connections.
Water and wastewater service in Tököl* |
|||
Residential customers |
|||
Water tariff |
291.20 HUF/m3 |
||
Wastewater tariff |
257.40 HUFm3 |
||
Water load fee |
17.90 HUF/m3 |
||
Non-utility collected wastewater removal fee** | |||
Short pipe (under 20 m) |
12,937.49 HUF/turn |
||
Long pipe (over 20 m) |
15,524.48 HUF/turn |
||
Non residential customers |
|||
Water tariff |
463.40 HUF/m3 |
||
Wastewater tariff |
466.90 HUF/m3 |
||
Water load fee |
19.90 HUF/m3 |
||
Non-utility collected wastewater removal fee** | |||
Short pipe (under 20 m) |
14,376.40 HUF/turn |
||
Long pipe (over 20 m) |
17,251.68 HUF/turn |
* In Tököl, water and wastewater services are carried out by Budapest Waterworks since 3 December 2013.
** Budapest Waterworks carries out non-utility collected wastewater removal since 1 June 2015.
Water service in Törökbálint* |
|||
Residential customers |
|||
Water tariff |
218.90 HUF/m3 |
||
Base fee in case of consumption over 0 m3/month per month** |
179.95 HUF/month |
||
Non residential customers |
|||
Water tariff |
252.60 HUF/m3 |
||
Base fee** | |||
In case of daily average consumption between 0 m3 and 7,5 m3 per year |
18,897.60 HUF/year |
||
In case of daily average consumption between 7,5 m3 and 15 m3 per year |
69,037.20 HUF/year |
||
In case of daily average consumption over 15 m3 per year |
112,623.60 HUF/year |
* Budapest Waterworks does not provide potable water services in the city of Törökbálint, it provides water services
only to certain customers in some of its areas adjacent to Budapest in the area of the old Mechanical Works.
** Basic fee is invoiced per connection in case the current consumption is over 0 m3.
*** Invoicing is based on the daily average consumption on the business organization’s contracted connections.
Water service in Vecsés* |
|||
Residential customers |
|||
Water tariff |
218.90 HUF/m3 |
||
Base fee in case of consumption over 0 m3/month per month** |
179.95 HUF/month |
||
Non residential customers |
|||
Water tariff |
252.60 HUF/m3 |
||
Base fee*** | |||
In case of daily average consumption between 0 m3 and 7,5 m3 per year |
18,897.60 HUF/year |
||
In case of daily average consumption between 7,5 m3 and 15 m3 per year |
69,037.20 HUF/year |
||
In case of daily average consumption over 15 m3 per year |
112,623.60 HUF/year |
* Budapest Waterworks does not provide potable water services in the city of Vecsés, it provides water services only in its area adjacent to Budapest, near to the Üllői út.
** Basic fee is invoiced per connection in case the current consumption is over 0 m3.
*** Invoicing is based on the daily average consumption on the business organization’s contracted connections.
The following tables contain the gross prices valid from January 1, 2020, calculated with 27% VAT.
Fee for connection claim evaluation (provisional permit) |
|||
Water |
8,750.00 HUF |
||
Wastewater |
8,750.00 HUF |
||
Water+wastewater |
13,843.00 HUF |
Water network plan approval |
|||
Up to one level (up to 5 outlets) |
6,566.00 HUF |
||
Up to three levels (up to 30 outlets) |
15,304.00 HUF |
||
30-99 outlets |
31,344.00 HUF |
||
100-299 outlets |
86,004.00 HUF |
||
from 300 outlets | 137,020.00 HUF |
Wastewater network plan approval |
|||
Up to one level (up to 5 outlets) |
6,566.00 HUF |
||
Up to three levels (up to 30 outlets) |
15,304.00 HUF |
||
30-99 outlets |
31,344.00 HUF |
||
100-299 outlets | 86,004.00 HUF | ||
from 300 outlets |
137,020.00 HUF |
Water and wastewater network plan approval |
|||
Up to one level (up to 5 outlets) |
10,617.00 HUF |
||
Up to three levels (up to 30 outlets) |
21,577.00 HUF |
||
30-99 outlets |
40,958.00 HUF |
||
100-299 outlets | 101,168.00 HUF | ||
from 300 outlets |
156,553.00 HUF |
Fees related to sewerage connections |
|||
Technical acceptance of open trench channel connection with travel fee (HUF/occasion) |
9,906.00 HUF |
||
Technical acceptance of channel connection with camera, with travel fee (HUF/occasion) |
29,083.00 HUF |
||
Technical acceptance of channel connection without additional lift-in charge with travel fee (HUF/occasion) |
6,604.00 HUF |
||
Technical acceptance of open trench channel connection, without travel fee (HUF/occasion) | 4,572.00 HUF | ||
Technical acceptance of channel connection with camera, without travel fee (HUF/occasion) | 19,177.00 HUF | ||
Technical acceptance of channel connection without additional lift-in charge and travel fee (HUF/occasion) | 3,175.00 HUF |
Channel camera check | |||
Travel fee (HUF/occasion) |
13,335.00 HUF | ||
Work fee between 1 and 50 meter | 22,416.00 HUF | ||
Work fee above 50 meter (HUF/m) | 279.00 HUF |
Channel controll by smoke | |||
Travel fee (HUF/occasion) | 10,922.00 HUF | ||
Work fee between 1 and 50 meter | 15,494.00 HUF |
Channel cleaning (by Woma) | |||
Travel fee (HUF/occasion) | 23,114.00 HUF | ||
Work fee (HUF/hour) | 20,066.00 HUF |
Apartment submeter related fees |
|||
Individual apartment submeter registration fee / per consumption location |
3,200.00 HUF |
||
Commissioning of an apartment submeter in case of new installation (trip charge: 2,000.00 HUF, on-site work fee: 3,301.00 HUF, administration fee: 3,500.00 HUF) |
8,801.00 HUF |
||
Administration fee charged for a new installation carried out by a certified contractor |
3,500.00 HUF |
||
Comissioning of apartment submeter after submeter replacement (trip charge: 2,000.00 HUF, on-site work fee: 2,700.00 HUF, administration fee: 2,901.00 HUF) call-out fee |
7,601.00 HUF |
||
Administration fee charged for the replacement carried out by a certitied contractor | 2,901.00 HUF | ||
Lead seal replacement for an apartment submeter (trip charge: 2,000.00 HUF, on-site work fee: 2,700.00 HUF, administration fee: 2,301.00 HUF) | 7,001.00 HUF | ||
Apartment submeter failed commissioning fee |
2,901.00 HUF |
||
Apartment submeter removal of (lead) seals, special appointment |
6,600.00 HUF |
||
Billing restart fee of water sub-meter, when ordering before the expiration of validity |
0.00 HUF |
||
Billing restart fee of water sub-meter, in case of order after expiration of validity |
3,100.00 HUF |
||
Apartment submeter extraordinary meter accuracy inspection with meter reassembly2 |
32,855.00 HUF |
||
Apartment submeter extraordinary meter accuracy inspection with meter reassembly (for every additional meter)2 |
14,656.00 HUF |
||
Apartment submeter extraordinary meter accuracy inspection in case of meter replacement purchase2 |
24,428.00 HUF |
||
Apartment submeter extraordinary meter accuracy inspection in case of meter replacement purchase (for every additional meter)2 |
10,846.00 HUF |
||
Apartment submeter list per address |
2,057.00 HUF |
||
Apartment submeter administrative fee (per invoice) – residential |
251.00 HUF |
||
Apartment submeter administrative fee (per invoice) – non-residential |
301.00 HUF |
||
Apartment submeter archival service fee |
1,683.00 HUF |
||
Replacement of an individual flat’s sub-meter | |||
Between January 1, 2020 and May 31, 2020 | |||
Replacement of an individual flat’s sub-meter with a single meter carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 18,200.00 HUF | ||
Replacement of individual flat sub-meters for two meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 26,600.00 HUF | ||
Replacement of individual flat sub-meters for four meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 43,301.00 HUF | ||
Replacement of individual flat sub-meters for all additional meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 8,400.00 HUF | ||
Between June 1, 2020 and October 31, 2020 | |||
Replacement of an individual flat’s sub-meter with a single meter carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 19,801.00 HUF | ||
Replacement of individual flat sub-meters for two meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 28,900.00 HUF | ||
Replacement of individual flat sub-meters for four meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 47,000.00 HUF | ||
Replacement of individual flat sub-meters for all additional meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 9,100.00 HUF | ||
Between November 1, 2020 and December 31, 2020 | |||
Replacement of an individual flat’s sub-meter with a single meter carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 21,400.00 HUF | ||
Replacement of individual flat sub-meters for two meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 31,200.00 HUF | ||
Replacement of individual flat sub-meters for four meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 50,800.00 HUF | ||
Replacement of individual flat sub-meters for all additional meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 9,801.00 HUF | ||
Replacement of an individual flat’s sub-meter for a single meter – without meter | |||
Replacement of an individual flat’s sub-meter for a single meter – without meter – carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)2 | 13,208.00 HUF | ||
Replacement of individual flat sub-meters for two meters – without meters – carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)2 | 16,891.00 HUF | ||
Replacement of individual flat sub-meters for four meters – without meters – carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)2 | 24,130.00 HUF | ||
Replacement of individual flat sub-meters for all additional meters – without meters – carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)2 | 3,683.00 HUF | ||
Replacement of an individual flat’s sub-meter – | |||
Replacement of an individual flat’s sub-meter with a single meter carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 19,801.00 HUF | ||
Replacement of individual flat sub-meters for two meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 28,900.00 HUF | ||
Replacement of individual flat sub-meters for four meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 47,000.00 HUF | ||
Replacement of individual flat sub-meters for all additional meters carried out by Budapest Waterworks (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 9,100.00 HUF | ||
Multiple multiple sub-meter replacement | |||
Between January 1, 2020 and May 31, 2020 | |||
Call-out fee (one of amount) in case of multiple multiple sub-meter replacement | 0.00 HUF | ||
Multiple sub-meter replacement by Budapest Waterworks in case of a single meter (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 16,500.00 HUF | ||
Multiple sub-meter replacement by Budapest Waterworks in case of two meters (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 25,601.00 HUF | ||
Multiple sub-meter replacement by Budapest Waterworks in case of four meters (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 43,800.00 HUF | ||
Multiple sub-meter replacement by Budapest Waterworks for each further meter (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 10,601.00 HUF | ||
Between June 1, 2020 and October 31, 2020 | |||
Call-out fee (one of amount) in case of multiple multiple sub-meter replacement | 4,900.00 HUF | ||
Multiple sub-meter replacement by Budapest Waterworks in case of a single meter (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 16,500.00 HUF | ||
Multiple sub-meter replacement by Budapest Waterworks in case of two meters (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 25,601.00 HUF | ||
Multiple sub-meter replacement by Budapest Waterworks in case of four meters (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 43,800.00 HUF | ||
Multiple sub-meter replacement by Budapest Waterworks for each further meter (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 10,601.00 HUF | ||
Between November 1, 2020 and December 31, 2020 | |||
Call-out fee (one of amount) in case of multiple multiple sub-meter replacement | 5,400.00 HUF | ||
Multiple sub-meter replacement by Budapest Waterworks in case of a single meter (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 |
17,800.00 HUF |
||
Multiple sub-meter replacement by Budapest Waterworks in case of two meters (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 27,600.00 HUF | ||
Multiple sub-meter replacement by Budapest Waterworks in case of four meters (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 47,301.00 HUF | ||
Multiple sub-meter replacement by Budapest Waterworks for each further meter (removal of the end piece, replacement of meter, commissioning, administration fee, on-site visit fee)1 | 11,600.00 HUF |
Fees related to garden water meter |
|||
Garden water meter plan approval |
2,300.00 HUF |
||
Comissioning of a garden meter in case of new installation (trip charge: 2,000.00 HUF, on-site work fee: 3,301.00 HUF, administration fee: 3,500.00 HUF) |
8,801.00 HUF |
||
Administration fee charged for a new installation carried out by a certified contractor |
3,500.00 HUF |
||
Comissioning of a garden meter in case of replacement (trip charge: 1,524.00 HUF, on-sit work fee: 3,175.00 HUF, administration fee: 2,794.00 HUF) |
7,601.00 HUF |
||
Lead seal replacement for a garden meter (trip charge: 2,000.00 HUF, on-site work fee: 2,700.00 HUF, administration fee: 2,301.00 HUF) |
7,001.00 HUF |
||
Garden meter failed meter commissioning fee |
2,901.00 HUF |
||
Garden meter removal of (lead) seals, special appointment |
6,600.00 HUF | ||
Garden meter restart fee of water sub-meter, when ordering before the expiration of validity | 0.00 HUF | ||
Garden meter restart fee of water sub-meter, in case of order after expiration of validity | 3,100.00 HUF | ||
Garden meter administration fee per invoice – residential |
331.00 HUF |
||
Garden meter administration fee per invoice – non-residential |
370.00 HUF |
||
Garden meter archival service fee |
1,683.00 HUF | ||
Budapest Waterworks’ charges for the replacement of a garden meter – in case of 1 submeter (lead seal removal, meter replacement, commissioning, administration fee, trip charge)1 |
19,801.00 HUF | ||
Budapest Waterworks’ charges for the replacement of each additional garden meter (lead seal removal, meter replacement, commissioning, administration fee, trip charge)1 | 9,100.00 HUF |
Map copy |
|||
By segment |
36,830.00 HUF |
||
Per A/4 page |
12,446.00 HUF |
Specialized data service |
|||
By segment |
6,477.00 HUF |
||
Per A/4 page |
5,334.00 HUF |
Measurement |
|||
Measurement under 0.1 km |
52,197.00 HUF |
||
Measurement between 0.1-0.5 km |
111,252.00 HUF |
||
House connection |
7,620.00 HUF |
Invoice related fees |
|||
Invoice copy (per invoice) |
1,270.00 HUF |
||
Extraordinary balance statement |
1,613 .00 HUF |
||
Certificate of water consumption |
1,626.00 HUF |
||
Compensation of payment notice related additional costs |
270.00 HUF**** |
**** The VAT content of this service is 0%.
Fees for water delivery permit |
|||
Administration fee |
35,624.00 HUF |
||
Meter usage fee |
318.00 HUF/ calendar day / meter |
||
Fire hydrant usage fee |
25.40 HUF/m3 |
||
Used water amount |
water tariff rate |
Fees related to provisioning and termination of service |
|||
Establishment of new connection |
charges calculated based on the connection parameters |
||
Severance implementation |
charges calculated based on the connection parameters |
||
Twin-meter installation |
charges calculated based on the connection parameters |
||
Fee for the repeated handover of a connection or water meter chamber (HUF/occasion) | 8,255.00 HUF | ||
Technical supervision: technical handover of connection carried out by external contractors (HUF/hour/person) | 8,255.00 HUF | ||
Investigation asked by customer | 10,033.00 HUF | ||
Network close and network open asked by customer | 20,066.00 HUF |
Rate of water utility development contribution |
||||||||
Settlement |
Drinking water (HUF) |
Wastewater (HUF) |
||||||
Budapest |
373,000.00 HUF |
- |
||||||
Budaörs |
373,000.00 HUF |
- |
||||||
Budakeszi |
373,000.00 HUF |
350,000.00 HUF |
||||||
Biatorbágy |
340,000.00 HUF |
420,000.00 HUF |
||||||
Dunabogdány | 208,000.00 HUF | 208,000.00 HUF | ||||||
Szigetmonostor-Horány |
373,000.00 HUF |
208,000.00 HUF3 |
||||||
Pócsmegyer-Surány |
373,000.00 HUF |
208,000.00 HUF3 |
||||||
Kisoroszi |
373,000.00 HUF |
208,000.00 HUF3 |
||||||
Szigetszentmiklós |
447,581.00 HUF |
447,581.00 HUF |
||||||
Szigetszentmiklós-Lakihegy |
373,000.00 HUF |
447,581.00 HUF |
||||||
Halásztelek |
373,000.00 HUF |
280,000.00 HUF |
||||||
Tököl |
200,000.00 HUF |
300,000.00 HUF |
Customer change related fees |
|||
Late replacement of consumer's name between 15 and 90 days (per consumption point) |
3,220.00 HUF**** |
||
Late replacement of consumer's name over 90 days (per consumption point) |
6,450.00 HUF**** |
||
Express registration (per consumption point) |
5,309.00 HUF |
**** The VAT content of this service is 0%.
Other fees |
|||
Photocopy A4 |
32.00 HUF |
||
Photocopy A3 |
51.00 HUF |
||
Exclusion, restriction administration fee |
35,890.00 HUF |
||
Exclusion, restriction / re-connection |
34,912.00 HUF |
||
Failed investigation | 13,310.00 HUF | ||
Registered pressure measurement |
30,861.00 HUF |
||
Connection water meter closing component replacement | 14,624.00 HUF | ||
Engineering consultancy fee | 10,160.00 HUF/hour/person | ||
Expert engineering consultancy fee | 15,240.00 HUF/hour/person |
Fee for replacement of connection water meter to be implemented on individual request, outside of service hours, on working days4 | |
---|---|
13–25 (NA) | 20,066.00 HUF |
40–100 (NA) | 40,843.00 HUF |
150 (NA) | 77,876.00 HUF |
200 (NA) or above | 115,062.00 HUF |
Fee for replacement of connection water meter to be implemented on individual request, outside of service hours, on Saturday or Sunday4 | |
---|---|
13–25 (NA) | 22,733.00 HUF |
40–100 (NA) | 46,025.00 HUF |
150 (NA) | 89,306.00 HUF |
200 (NA) or above | 132,588.00 HUF |
Extraordinary meter accuracy inspection (connection water meter) |
|||
13-20-25 (NA) |
22,758.00 HUF |
||
40 (NA) |
30,842.00 HUF |
||
50 (NA) |
33,998.00 HUF |
||
80 (NA) |
51,676.00 HUF |
||
100 (NA) |
53,251.00 HUF |
||
150 (NA) |
72,098.00 HUF |
||
200 (NA) |
96,215.00 HUF |
||
50/20 (NA) |
66,015.00 HUF |
||
80/20 (NA) |
73,838.00 HUF |
||
100/20 (NA) |
84,138.00 HUF |
||
100/25 (NA) |
84,138.00 HUF |
||
150/40 (NA) |
86,335.00 HUF |
||
200/40 (NA) |
124,257.00 HUF |
Meter strutural inspection | |||
Structural inspection under NA 25 | 30,861.00 HUF | ||
Structural inspection above NA 25 | 43,713.00 HUF |
Frozen or damaged meter repair, replacement**** |
|||
13 and 20 (NA) |
17,300.00 HUF |
||
25 (NA) |
23,300.00 HUF |
||
40 (NA) |
69,100.00 HUF |
||
50 (NA) |
87,300.00 HUF |
||
80 (NA) |
110,300.00 HUF |
||
100 (NA) |
114,300.00 HUF |
||
150 (NA) |
175,200.00 HUF |
||
200 (NA) |
196,100.00 HUF |
||
50/20 (NA) |
99,300.00 HUF |
||
80/20 (NA) |
126,500.00 HUF |
||
100/20 (NA) |
277,700.00 HUF |
||
100/25 (NA) |
277,700.00 HUF |
||
150/40 (NA) |
436,400.00 HUF |
||
200/40 (NA) |
530,800.00 HUF |
Fee for suspension of drinking water supply |
|||
Budapest | Agglomeration | ||
13 (NA) |
34,925.00 HUF |
30,099.00 HUF | |
20 (NA) |
35,052.00 HUF |
30,226.00 HUF | |
25 (NA) |
35,179.00 HUF |
30,353.00 HUF | |
50 (NA) |
40,132.00 HUF |
34,544.00 HUF | |
2 pcs 20 (NA) twin-meter |
49,403.00 HUF |
42,672.00 HUF | |
2 pcs 25 (NA) twin-meter |
52,959 HUF |
45,593.00 HUF |
**** The VAT content of this service is 0%.
1 Fee items may vary in Szigetszentmiklós, Tököl and Százhalombatta.
2 Processes and fees valid for meter chambers constructed in accordance with the requirements set forth by Budapest Waterworks under the applicable standards. The fees do not include the price of the meter(s) with regard to sub-meters.
3 In case of property next to the existing core network. In case there is also a core network development, it is HUF 170,000.00.
4 Fee shall be applied if the user requires the replacement of a connection water meter to be implemented outside the period stipulated by the regulation – Government Decree No. 58/2013. (II. 27.) on implementation of some regulations of Act No. CCIX. of 2011 on water public utility service – i.e.
- on Saturday or Sunday
- on working days from 1 May to 30 September between 8 p.m. and 7 a.m. on the following day, or from 1 October to 30 April between 7 p.m. and 7. a.m. on the following day.